|
Product Detail :
|
The work involves the supply and installation of GI pipes class B, each measuring 3.05 meters in length. This includes threading, welding with heavy-duty flanges on both ends, and jointing using nuts and bolts along with rubber gaskets. The pipes will be lowered into tube wells and tested, with all associated tasks such as loading, unloading, and transportation being completed to the satisfaction of the engineer in charge. GI pipes class B, rubber gaskets
|
| Tender Detail : |
The work involves the supply and installation of GI pipes class B, each measuring 3.05 meters in length. This includes threading, welding with heavy-duty flanges on both ends, and jointing using nuts and bolts along with rubber gaskets. The pipes will be lowered into tube wells and tested, with all associated tasks such as loading, unloading, and transportation being completed to the satisfaction of the engineer in charge. |